Active Projects

  • Booker Middle School

  • Venice High School

  • Global Organics

  • St. Thomas Moore Catholic Church

  • Laurel-Nokomis

  • Booker High School

  • Sarasota County Technical Institute

  • Sarasota Police Department

Completed Projects

  • Four Duplexes

    Project Location: Florida
    Project Type: Complete Demolition

    This is a completed demolition. Our first call on this project was 24 Aug 2007. We facilitated abatement with BC at one address and proceeded with rush demolition on Sept. 11, 2007.

    Total project cost-$38,300.00

  • 486 Island Circle

    Project Location: Sarasota, FL
    Project Type: Complete Demolition

    Contractor was Coastal Communities. This home required 3 days to complete. This project included a house and pool and included installing pool fill. The lot is canal front so care was required in keeping the debris and silt from the water.

  • 656 Beach Rd.

    Project Location: Siesta Key, FL
    Project Type: Complete Demolition

    Contractor was Howell Construction. This home required 3 days to demolish and remove. This home was beach front on Siesta Key so required care as concerned the dunes.

  • Sarasota County Emergency Demolition

    Project Location: Sarasota, FL
    Project Type: Complete Demolition

    The contractor is Sarasota County Code Enforcement. Project Location is Sarasota. This project is scheduled for 8 days. This project is an Emergency demolition for Sarasota County. The 4 duplexes were abandoned during renovation and required immediate demolition and abatement. Our time from Estimation to start has been 10 business days.

  • The Sarasota Opera House

    Project Location: Sarasota, FL
    Project Type: Selective Demolition

    The Sarasota Opera House was completed in seven weeks for Willis A. Smith Construction. It was a major interior selective demolition and concrete cutting project. We began the project in May and finished the middle of June 2007.

  • Riviera South Shore

    Project Location: Bradenton, FL
    Project Type: Complete Demolition

    These are just some of the photos from the 44 houses that we are currently demolishing for First Dartmouth Homes and Barfield Construction in downtown Bradenton. The project is called Riviera South Shores. We started this project three weeks ago and should be completed by mid July.

  • Meridian Distribution Center

    Project Location: Sarasota, FL
    Project Type: Complete Demolition

    Our scope of work was complete demolition of a portion and concrete cutting and selective demolition of the rest. Completion time: 7 weeks.

  • J P Milller Elementary

    Project Location: Bradenton, FL
    Project Type: Complete Demolition

    We just completed this project on June 18th. This was a complete demolition of selected buildings that we completed in four weeks. The contractor on the project is WG Mills.

  • Janie Poe

    Project Location: Sarasota, FL
    Project Type: Complete Demolition

    Large housing complex that was demolished to make way for a much newer complex. It is a HUD and Sarasota Housing Program venture. The contractor is Clark Construction. The entire project (including abatement) was completed in less than two months.

  • Sizzler Steak House

    Project Location: Bradenton, FL
    Project Type: Complete Demolition

    Complete demolition of Sizzler Steak House building in parking lot of high traffic shopping center Bradenton Fl. Project completed for Zoller Construction. Time to complete: 4 working days.

  • K-Mart

    Project Location: Bradenton, FL
    Project Type: Complete Demolition

    112,000sf building complete demolition, job completed in 26 working days under very aggressive schedule. For Zirklebach Construction.

  • 437 Gulf St.

    Project Location: Venice, FL
    Project Type: Complete Demolition

    Complete demolition of 2000sf residential structure for homeowner. Complete in two days.

  • 1441 John Ringling Blvd.

    Project Location: Lido Key, FL
    Project Type: Complete Demolition

    Complete demolition of waterfront 6000sf house for the owner.

  • McDonalds Restaurant Re-build – Bee Ridge Rd.

    Project Location: Sarasota, FL
    Project Type: Complete Demolition

    Complete demolition of 3000sf+ steel and CMU building structure under tight 2 week schedule.
    Included wet demolition for dust controll on major road.
    McDonalds Bee Ridge Rd. 011

  • Westgate Shopping Center

    Project Location: Florida
    Project Type: Complete Demolition

    The structural steel and masonry structure was separated and the concrete and steel components were recycled. McIntyre, Elwell, Strammer General Contractors, Inc. was the Construction Manager for the project.

  • DeSoto Square Mall

    Project Location: Bradenton, FL
    Project Type: Complete & Selective Demolition

    In addition to complete demolition, Forristall Enterprises, Inc. also provides clients with interior, selective demolition services. Forristall Enterprises, Inc. demolished five units for the new Old Navy Store which opened for back-to-school shopping in August 2000. The interior finishes were demolished and removed from the site using our dumpster service, Forristall Roll-off Services, Inc. The demolition contract was completed in two weeks.

  • Robb & Stucky

    Project Location: Sarasota, FL
    Project Type: Selective Demolition

    Forristall Enterprises, Inc. was hired to perform the structural, selective demolition of the Robb & Stucky furniture store in Sarasota, Florida. This fast-tracked project was completed while the high-end furniture store remained open to the public. First, the porte-cochere structure was cut free from the building and removed in its entirety. Then, we demolished the Lobby and Atrium areas including removing the indoor fountain. This project should be complete in May 2000, including numerous change orders and overtime work. This is our second major demolition project with D.L. Porter Constructors.

  • Sarasota County Justice Center

    Project Location: Sarasota, FL
    Project Type: Selective Demolition

    Selective demolition of justice center facility.

  • Sarabay Real Estate Office

    Project Location: Sarasota, FL
    Project Type:

    New Construction of a 3,000 square foot real estate office facility including sitework.

  • Howard Johnson´s

    Project Location: Punta Gorda, FL
    Project Type: Complete Demolition

    Complete demolition of a waterfront hotel lobby, sign and family restaurant facility.

  • Palmetto High School

    Project Location: Palmetto, FL
    Project Type: Complete & Selective Demolition

    Complete demolition of high school campus, including selective demolition of 8 buildings. Our contract also included asbestos abatement.

  • Equifax Building

    Project Location: Tampa, FL
    Project Type: Selective Demolition

    Complete interior demolition, including UPS and battery packs, conduit, equipment and cable for over 900 telephone lines. This fast-tracked project was completed in 45 days.

  • Ross Dress for Less and Service Merchandise

    Project Location: Bradenton, FL
    Project Type: Selective Demolition

    Complete interior demolition of old Wal-Mart store, including mezzanine removal.

  • Beach Re-nourishment

    Project Location: Bradenton, FL
    Project Type:
  • Sarasota County Government Central Administration Facility

    Project Location: Sarasota, FL
    Project Type: Complete Demolition

    Complete demolition including structural component, HVAC systems, conduit, raised access flooring, UPS systems, and elevators, in an old GTE building.